|
Agenda
for Business: ·
August meeting date:
move to 4th Tuesday ok?
(August 22nd) ·
Project Committee ( ·
Field Trip to Wells –
move to Sept? ·
Wilmington Waterfront Day,
August 24th : planning
tomorrow ·
Web updates – Nshallah
by end of this week. Work: ·
Policy small group review
– rapporteur brings comments ·
New? related is Other related News: ·
Another draft of inventory ·
Judi - beautification grant
to landscape the library. ·
DOT catchment basin on the
library side of the bridge. Minutes
-- June 20 Attending:
Holly A., Jane S., Garrett, Gary and Alison F., Anne Barlow, Ray
Curran, Ginny Crispell, Tom Hinman, Jeanne A.
Interested Public: Nancy
Humphries, Marian and Peter Yuro, Nicole Orsa, Sheila Williams ·
Public inquiry about dam
gates status from Mr. Yuro; JA gave update.
·
AuSable River Association
presentation on o
Runoff polluted by grease,
concrete trush washings, nutrients, pesticides, and especially sediment
(much from construction sites – up to 2000x more than from forested
lands on average), for months after construction is done.
o
Reviewed zoning and site
plans for W’ton and recommends a law that focuses just on stormwater
and construction, using a template.
Recommends assigning review duty to a Town officer, with a bond
from plan owner. The plan
required would include soil map, construction phasing plan, pollution
prevention measures, soil stabilization measures, temporary v. permanent
erosion control practices, schedule for maintenance.
o
Recommends mapping
catchment basins and reviewing road maintenance procedures, labeling
basins with dates for cleaning and phone number for resident use.
o
The committee agreed these
ideas may need to be addressed in LWRP policies. ·
Community Tourism Exchange
Day ideas, from Adirondack Sustainable Communities’ Ray Curran: o
o
Joe Hackette – column in
LP news o
Networking of Fire Towers
as cultural heritage of ADKs, video o
Economic viability of
tourism in ADKs, compared to ·
Policy Committee draft for
Review – Due date of Comments – Mini-meeting o
Handing out rough first
draft for review, including Lisa Nagle comments.
Due July 7. Mini-meeting
missed due to busy schedules. o
Project Committee to Meet
– Mini-meeting missed due to busy schedules.
Jane, Nancy H., Kara, JA, others? ·
Field Trip to Wells July 3
– moved… Party!
Thanks Gary and Alison!! Project Ideas
collected as of July 2: ·
Improve parking area by
flume bridge and put in protected walkway along bridge for viewing of
the flume. ·
Improve nature walkways on
both sides of flume ·
Put in signage and
historical information plaques throughout ·
Improve and extend sidewalk
system in town center ·
Improve park area by dam
bridge. ·
Build
historical/interpretive center (or kiosk) by entrance to ·
Improve town beach pavilion
area and picnic area ·
Establish bike path around
Town ·
Plant trees along Route 86
through town center ·
Landscape 4 corners area
(Route 86 and ·
Encourage establishment of
recreational businesses in town – boat rentals, bike rentals ·
Dredge river and find ways
to minimize sediment drainage into river ·
Provide information on bird
life in ·
Fix dam so it can
effectively control water level in river ·
Pave parking lot by ·
Bury power lines that run
through the center of town ·
Put in scenic pull over
area by Paleface that allows view of valley and mountains ·
Put up decorative signage
on all roads entering ·
Amend subdivision
regulations with affordable housing criteria and green community design
guidance. ·
Request DEC review of the
fishing access sites in ·
Historic district: 1982
proposal. Resubmit in coordination with WHS. ·
Trail map – formal and ?
informal. ·
Bridge stonework ·
Power lines underground ·
Beach pavilion / area
revitalization - proposal submitted to do master plan. ·
Sedimentation source study ·
Dredging feasibility study
– proposal submitted. (Please excuse the
repetition.) |